The Restoration Dictionary: Part 2

Facebook
Twitter
LinkedIn
Print

Effective communication between the various stakeholders in our industry relies on the use of a shared language with clear meanings. Recognizing this need, the IICRC has developed the IICRC Standards, providing industry professionals with a common language and set of definitions. In this article, we’ll cover a few key terms that all cleaning and restoration professionals should know.

If you missed it, make sure to review the first set of definitions in Part 1 of The Restoration Dictionary series.

Abatement: This is the process of removing the presence of hazardous materials such as asbestos and lead paint.

Clean (restoration): To eliminate residues or contaminations caused by a particular incident or damage rather than pre-existing or normal conditions.

Clean for clean (final clean): This term refers to the cleaning of building surfaces, such as walls, ceilings, and trim, without the need for painting. It’s sometimes called “clean only” and is the final restoration process.

Clean for clean (restoration): This refers to the process of cleaning ceilings, walls, flooring, doors, windows, and cabinets without the need for painting or refinishing.

Clean for paint / Prepare for paint: This describes the necessary steps for preparing a surface before applying a sealer or paint. It involves removing surface dirt, smoke film, and other contaminants, as well as any residues that may affect the adhesion of the coating.

Stay tuned for the next installment of The Restoration Dictionary!

Joshua Woolen

Josh Woolen is the owner of EGA-Commissioner (EGA-Cx), which works as a third-party on behalf of the contractor and only the contractor, unlike most of the other third-parties who work for the benefit of the property owner, property manager, or insurance company. The Commissioning (Cx) Process is a systematic process for the contractor to ensure they have representation during specific points of the project or the entirety of the project. This gives the documentation for the work neededwork being performed, and the work achieved after site departure that requires third-party validation.

(570) 664-7947 & [email protected]

(No Ratings Yet)
Latest Posts
Most Popular

Hey there! We're glad you're here!

This content is only available for subscribers. Please enter your email below to verify your subscription.

Don't worry! If you are not a subscriber, simply enter your email below and fill out the information on the next page to subscribe for FREE!

Back to homepage